Source
https://www.aucklandcouncil.govt.nz/plans-projects-policies-reports-bylaws/our-plans-strategies/unitary-plan/history-unitary-plan/docs317maoriland/Appendix%203.17.4.pdf — original source (opens in a new tab; the file is not redistributed)
Hoskins / design TRIBE (2012) — Papakāinga Technical Report for Auckland Council
Papakāinga cited strictly as an external COST + REGULATORY exemplar (NOT a solution the project replicates). Advances RT_308 — a completed rural NZ papakāinga (Horaparaikete, Tauranga, done Oct 2009) with per-dwelling build costs (5 homes ~
120k–220k each;1,070–1,220/m²) + a 400 m² communal Whare Tāpiri (350k) + RMA consent costs (18k consent; $2,500 notification). ⚠ These are the whānau's own "approx" self-reported estimates, 2009 NZD, and cover conventional dwelling builds only — NO off-grid energy/water system costs are disclosed (the genuinely off-grid Pōike case has no costed figures). So it is a rural build-cost anchor beside Earthsong (OT_098), not the off-grid CapEx premium RT_308 still needs.
Summary
A technical report prepared by Rau Hoskins (design TRIBE Architects Ltd) for Auckland Council staff drafting the Auckland Unitary Plan, profiling four papakāinga developments — Ōrākei (urban, planning phase), Pūkaki/Māngere (periurban, ~18 dwellings, due to build 2012), Horaparaikete/Tauranga Moana (rural, completed Oct 2009), and Pōike/Whāngaruru (remote coastal, 4 of a planned 10 whare built). The report is primarily a Resource Management Act / district-plan analysis: it tabulates the consent barriers each whānau faced (the “two dwellings per title” rule, notification costs, Council cultural insensitivity) and reviews new Tauranga City and Whāngarei District papakāinga provisions that would have eased those processes. Its value to this project is two-fold and bounded: (1) the Horaparaikete case study carries real, itemised per-dwelling build costs for a completed rural NZ community (five houses + a communal Whare Tāpiri) plus consent-process costs — a cost exemplar for the whole-project CapEx envelope; and (2) the Pōike case study documents a genuinely off-grid remote community (no road, no reticulated power/water/sewer, composting toilets + greywater + rainwater tanks, materials boated in) — but with no costed figures. Papakāinga is referenced here only as an external cost and regulatory reference point, consistent with the project’s standing boundary that it does not deliver or replicate a papakāinga / Māori-land solution.
Key claims
- claim: "Horaparaikete papakāinga (Welcome Bay, Tauranga; rural-zoned ~80-acre / 32.3ha block, ~1ha papakāinga area) was completed in October 2009 and comprises 5 residential homes, now occupied by families, and a large communal house, the Whare Tāpiri, owned and administered by the Trust."
source_location: "Section 4.3 Introduction, internal p.17; Section 2.3 issues table + Section 4.3, internal pp.4/18"
- claim: "Horaparaikete dwelling build costs (whānau 'approx' estimates): House 1 — 3 bed + internal garage, ~140m², approx $150,000 to build; House 2 — 4 bed + internal garage, ~180m², approx $220,000; House 3 — 3 bed, ~110m², approx $120,000; House 4 — 3 bed, ~110m², approx $120,000; House 5 — 4 bed + internal garage, ~180m², approx $220,000."
source_location: "Section 4.3 'Finance and owner profiles' — House 1–5 profiles, internal pp.20–21"
- claim: "Whare Tāpiri (communal house, design based on Marae principles; can sleep up to 30 and dine up to 100; 4 showers, 4 toilets) — approx 400m², approx $350,000 to build; owned by Trust, funded from Trust income."
source_location: "Section 4.3 'Finance and owner profiles' — Whare Tāpiri profile, internal p.21"
- claim: "Over a period of seven years the whānau fundraised and saved $120,000 towards the Whare Tāpiri capital costs. Despite this, another $150,000 capital was required for the build: Tauranga Moana Trust Board agreed to loan the Trust $100,000 (secured by personal guarantees of every Trustee) and the balance was made up from grants (Lotteries, TECT Trust, Bay Community Trust and the Environmental Enhancement Fund / BOP Regional Council)."
source_location: "Section 4.3, internal p.19 ($120,000); Section 4.3 'Finance and owner profiles', internal p.20 ($150,000 / $100,000 loan / grants)"
- claim: "The overall cost of the resource consent was $18,000 not including legal costs. TCC refused a limited-notification request and required full notification at an extra cost of $2,500 payable to Council. The consent was extended to 15 years to enable the project to be completed over time. (Legal submissions were provided pro bono by a Russell McVeagh partner.)"
source_location: "Section 4.3 'Planning issues and process', internal pp.19–20 ($18,000; $2,500; 15 years; pro bono legal)"
- claim: "Fire-fighting facilities which would have cost $8,000 to $10,000 per house were greatly reduced by constructing a shared facility with two manifold points to service all of the houses from a central point; everyone used the same water-tank supplier for a group discount and four of the five houses used the same kitset company for package discounts (economies of scale / shared resources)."
source_location: "Section 4.3 'Finance and owner profiles', internal p.20"
- claim: "The 'two dwellings per title' rule is the standard consent barrier: in 2004 the Tauranga City plan permitted only two dwellings per title despite the land's capacity, and at Horaparaikete the rural zoning allowing only two dwellings (with three houses already existing) triggered a discretionary resource-consent requirement. New Tauranga City Council provisions (Ch 16A.9) would instead have required only an Outline Development Plan with no resource consent for up to 10 units at min. 2,000m²/site — which 'would have saved the whānau over $22,000.00, 12 months of time and a lot of frustration'."
source_location: "Section 2.3 issues table, internal p.4; Section 3.0 New Papakāinga Planning provisions, internal p.7 ($22,000); Section 4.3 'Planning issues and process', internal p.19 (two-per-title rule)"
- claim: "Pōike C (Te Patunga Bay, Whāngaruru, Northland; 167ha block, ~2ha papakāinga) is a genuinely off-grid remote site: 'there is no road access and no council provided infrastructure services in terms of sewerage, storm water systems, water reticulation, power supply, and telephone / data. There is also no rubbish collection with all recycling and refuse having to be boated out.' Water is from a puna (spring) supplemented by rainwater tanks."
source_location: "Section 4.4 'The Site', internal p.24"
- claim: "Pōike whare (3 built since 2002 in addition to the original 1961 bach), each with on-site services: Pikiararoa — 110m² 2-bed + mezzanine, timber frame on timber piles, composting toilet and greywater system; Te Kahu — 90m² 1-bed + mezzanine, composting toilet and greywater system; Mihitai — 36m² 1-bed cabin, composting toilet and greywater system."
source_location: "Section 4.4 'Processes and Involvement of Whānau/Manawhenua', internal p.24"
- claim: "Pōike funding/construction barriers: 2 of the whare had to be built from cash reserves 'as no bank would lend on Māori land and the owners earnt too much to qualify for Housing New Zealand Corporation (HNZC) loan products'; one house (Te Kahu) was partially built from an HNZC loan. Building materials and construction expertise all had to come in by boat, and 'the lack of reticulated electricity was also a barrier with need to use generators for all powertools during construction'."
source_location: "Section 4.4 'Barriers to uptake/involvement', internal p.26"
- claim: "Report framing: 'with 83% of Māori now urbanised, increasingly such developments will desirably be developed in urban and peri-urban areas.' The four case studies were chosen for diverse settings (urban, periurban, rural, remote coastal); Horaparaikete and Pōike are complete, Pūkaki was due to build in 2012, and Ōrākei was still in the planning phase."
source_location: "Section 1.0 Introduction, internal pp.1–2"Neobiome Intelligence relevance
Boundary (stated explicitly, per the project’s standing instruction): papakāinga is cited here only as an external cost and regulatory exemplar. Neobiome Intelligence does not claim to know, deliver, or replicate a papakāinga / Māori-land housing solution; these figures are used the same way any comparable NZ community-build cost disclosure would be — to sanity-check the model’s CapEx envelope, not as a template the project reproduces.
- Rural NZ community per-dwelling build-cost anchor (D04, 2009 NZD). Horaparaikete gives itemised “approx” build costs for a completed rural papakāinga: five dwellings at
150k /220k /120k /120k /220k** (≈ **830,000 for the five, average ≈166,000/dwelling**) plus a 400 m² communal **Whare Tāpiri at ~350,000 — a five-dwelling-plus-communal total of ≈ **1.18M** (derived from the verbatim figures). Normalised: houses run **~1,071–1,222/m²** (140m²/150k; 180m²/220k; 110m²/120k) and the communal hall **~875/m²** (2009 NZD). This is a **rural, lower-cost counterpoint to Earthsong** ([[ot_098_earthsong-capital-costs|OT_098]], ~335k/dwelling all-in, 2000–08 grid-connected Auckland eco-neighbourhood): both are real NZ community builds, and the ~166k vs ~335k/dwelling spread brackets a plausible NZ community dwelling-CapEx range once inflated to 2026 and adjusted for standard vs eco-spec. - Consent / soft-cost data for the CapEx build-up (D04). Real regulatory soft costs:
18,000 resource consent** (excl. legal), **2,500 full-notification surcharge, and a documented saving of >$22,000 + 12 months where a permissive district-plan pathway (Outline Development Plan, no consent) replaced a discretionary consent. These are usable order-of-magnitude anchors for the consenting/soft-cost line of a community CapEx estimate. - Off-grid systems evidence — qualitative only (relevant to the RT_308 residual). Pōike is the genuinely off-grid case the RT_308 target is chasing (no reticulated power/water/sewer; composting toilets + greywater + rainwater/puna; generators for construction; materials boated in). But the report gives no costed off-grid system figures — so it confirms the technology stack and the remoteness premium qualitatively while leaving the off-grid CapEx premium still un-costed, exactly the residual OT_098 also left open.
- Shared-infrastructure economy-of-scale signal (D04). A concrete example of community-scale cost reduction: shared fire-fighting water storage cut a
8,000–10,000/house cost to a single central facility, and group procurement (one kitset supplier for 4 of 5 houses, one tank supplier) delivered package discounts — evidence for the “communal-share reduces per-dwelling CapEx” lever the model can reflect.
What it does NOT give (scope caveat): no whole-project total that includes infrastructure + off-grid energy/water systems; no post-2009 costs; no audited (vs “approx”) figures; and no cost data at all for the off-grid Pōike case. It advances, but does not resolve, RT_308.
Key thesis insights
- Regulation as the binding constraint on collective/alternative-tenure housing (regulation_policy, maori). The report is a clean evidence base for the thesis argument that district-plan rules — above all the ubiquitous “two dwellings per title” rule — are the structural barrier to community/collective living on rural land, and that permissive, culturally-grounded provisions (Tauranga City Ch 16A.9; the Whāngarei “carrying capacity of the land” + tikanga approach) materially cut time, cost and conflict. This generalises beyond papakāinga to any intentional-community subdivision facing the same rural two-dwelling ceiling.
- Māori-land finance exclusion (community_finance, maori). Both completed cases document that standard mortgage finance is unavailable on Māori Freehold Land (Pōike: “no bank would lend on Māori land”; whānau either self-funded from cash reserves or relied on HNZC/Kāinga Whenua-type products and Trust Board loans + grant stacks). This is the same structural finance constraint OT_015 identifies, evidenced here with named funders and dollar figures.
- Remoteness and self-provisioning as lived practice (community_resilience, building_habitat). Pōike shows a functioning remote off-grid community sustained on composting toilets, greywater, spring + rainwater, and boat access — a real NZ analogue for the “unserviced remote site” the project models, and an exemplar the report itself calls “an exemplar for building on remote and unserviced sites.”
Research targets
RT_308 (advanced — keep open, annotate)
This document advances but does not resolve RT_308 (whole-project CapEx ±20% validation via a completed off-grid subdivision / papakāinga). It adds a rural NZ papakāinga per-dwelling build-cost anchor (Horaparaikete, 2009: ~120k–220k/house, ~875–1,222/m², five dwellings + a $350k communal Whare Tāpiri) plus consent soft-costs — a lower-cost rural counterpoint to Earthsong (OT_098), the two now forming a paired partial for RT_308. The RT_308 residual remains OPEN: the off-grid systems premium is still un-costed — Pōike is genuinely off-grid but the report discloses no dollar figures for its energy/water systems, exactly the residual OT_098 also left open. RT_308 is annotated with this source_id alongside OT_098 and kept in Open (not moved to Done).
Research gaps
- None new. The residual — a completed NZ off-grid community with an itemised off-grid-systems cost breakdown (solar/battery, water supply/treatment, wastewater, backup) — is exactly the outstanding remainder of RT_308 itself, carried in the annotated RT_308 row rather than opened as a separate target (mirroring the OT_098 treatment).
Notes
Primary technical report (28 pp. PDF), read in full via pdftotext -layout — every cost/consent figure is verbatim-traceable to a named section and internal page, so data_quality: verified. The report’s own cost figures are the whānau’s self-reported “approx” estimates (the document uses “Approx $X to build” throughout), not audited accounts — verified against the raw as reported, but their precision is the source’s, not independently costed.
⚠ Filename misnomer (corrected at write): the retrieval filename RT_308_papakainga-development-costs-boffa-miskell-2011.pdf is wrong on both author and year — the document is the Papakāinga Technical Report for Auckland Council, Final Draft 30 April 2012, by Rau Hoskins (design TRIBE Architects Ltd). Boffa Miskell Ltd appears only as the Ōrākei spatial-planning/masterplan consultant (Section 4.1). Author/year/slug set to the true document; the raw is renamed to the canonical page stem ot_127_hoskins-2012-papakainga-costs.pdf at write.
⚠ Scope boundary (standing project rule): the project must not be interpreted as a papakāinga / Māori-land solution and makes no claim to know, deliver, or replicate one. This source is filed strictly as a cost and regulatory exemplar; the boundary is stated in the callout, the NI-relevance opener, and here. The approved decision (this batch) is context: both, feeding D04 only — because the Horaparaikete build costs are genuine NI CapEx-envelope evidence (the reason RT_308 sought a papakāinga), while no energy-system cost is disclosed (so it does not feed D01 the way OT_098 did). The conservative sibling papakāinga source OT_015 carries context: thesis / feeds: []; the cost content here justifies the fuller D04 routing without weakening the boundary.
⚠ Source-internal soft inconsistency (reported, not reconciled): the Whare Tāpiri is quoted at “approx 350,000 to build", while the finance narrative describes 120,000 fundraised + 150,000 additional capital (of which a 100,000 Trust Board loan) + unquantified grants — i.e. ~270k named against a 350k build. Both figures are reported verbatim; the report does not reconcile them (grants likely cover the ~$80k gap). Not treated as an error.
No canonical URL was captured at retrieval (url: left blank). This class of document (design TRIBE Papakāinga Technical Report for Auckland Council) was prepared for Auckland Council’s Unitary Plan process; a URL should be backfilled if the authoritative host is located.
Connections
Links to
Referenced by
Sources (1): OT_130
EDT domains (1): D04: Sustainable Habitat & Building Technology